Case Study 2

Upstairs floorboards replaced and two new bathrooms installed.

The standard of work was very good, above our expectations. This was a big project lasting two months which ran into the Christmas period. The area of work was small which in itself presented many challenges which they overcame. They delivered the project as per quotation.

Brighton, 20 January 2016

Bathroom One

Bathroom Two